Storm overflows performance and impact reportStorm overflows performance and impact report

Wessex Water
Created 2 days ago
This dataset provides information on all storm overflows which are fitted with Event Duration Monitoring (EDM) equipment. We currently report on Event Duration Monitoring (EDM) installed at 975 storm overflows (75%) and have an ongoing programme of installations that will provide 100% coverage (on all 1,289 overflows) by March 2023.This dataset provides information on all storm overflows which are fitted with Event Duration Monitoring (EDM) equipment. We currently report on Event Duration Monitoring (EDM) installed at 975 storm overflows (75%) and ...

Event Duration Monitor example dataEvent Duration Monitor example data

Wessex Water
Updated 2 years ago
This level dataset shows the level data for our Event Duration Monitors – monitors at combined sewer overflows showing the height of the sewage flow in our network at any given time. We have published it to support our EDM alarm challenge.  The first column shows the ID number that links to a specific monitor. The second is a date and time stamp, with the third being the level of the sewage at that time. For most monitors this is in m...This level dataset shows the level data for our Event Duration Monitors – monitors at combined sewer overflows showing the height of the sewage flow in our network at any given time. We have published it to support our...

Sewage Pumping Station Run Stop example dataSewage Pumping Station Run Stop example data

Wessex Water
Updated 2 years ago
This run-stop dataset shows the run-stop data for the 20 pumping stations in the Bath catchment. We have published it to support our EDM alarm challenge. Initially we published 2 years of data (where available) up until March 2019. We have subsequently shared a further 12 months of this data - these two files can be found in this data set. The  CSO schematic  PDF file is provided to show the flow relationships between the pumping statio...This run-stop dataset shows the run-stop data for the 20 pumping stations in the Bath catchment. We have published it to support our EDM alarm challenge. Initially we published 2 years of data (where available) up until ...

Sewer scanning CCTV footageSewer scanning CCTV footage

Wessex Water
Created 2 years ago
These files are a small subset of the files that will be shared as part of the sewer defect recognition algorithm challenge (see the challenge section for more infromation). We cannot share all the files here due to limitations on file size. We have given here examples of the CCTV footage taken from the surveys and one of the logs that accompanies a group of surveys.These files are a small subset of the files that will be shared as part of the sewer defect recognition algorithm challenge (see the challenge section for more infromation). We cannot share all the files here due to limi...

Drainage and Wastewater Management plansDrainage and Wastewater Management plans

Wessex Water
Updated 3 years ago
In line with a consistent approach across water companies in England and Wales, as developed through the 21st Century drainage programme, we are working with our stakeholders, regulators and customers to produce 25-year drainage and wastewater management plans (DWMPs). This will involve creating: a company-wide drainage and wastewater management plan drainage and wastewater management catchment plans for Bristol Avon, Dorset, Hamps...In line with a consistent approach across water companies in England and Wales, as developed through the 21st Century drainage programme, we are working with our stakeholders, regulators and customers to produce 25-year ...

Water Resources Management PlanWater Resources Management Plan

Wessex Water
Created 3 years ago
Our water resources management plan sets out how, over the next 25 years, we will balance water supplies with water demands to ensure adequate water supply for our customers, whilst also protecting the environment. Water companies are required to prepare and maintain a water resources plan on a five-yearly cycle. The plan is produced following guidance provided by the Environment Agency, our environmental regulator, and in accordance wi...Our water resources management plan sets out how, over the next 25 years, we will balance water supplies with water demands to ensure adequate water supply for our customers, whilst also protecting the environment. Water...